API 2610 โ Design, Construction, Operation, Inspection and Maintenance of Terminal and Tank Facilities
Systematically assess your petroleum terminal and tank facility operations against API 2610 โ covering facility design and layout, fire protection systems, truck/marine/rail/pipeline loading and unloading operations, overfill prevention, tank inspection and maintenance programmes, piping and measurement systems, environmental management, physical security, emergency response planning, and terminal operations management.
API 2610 (3rd Edition)Fire Protection โ NFPA 11/30Overfill Prevention SystemsEnvironmental ManagementCustody Transfer & MeasurementAuto-Save Enabled
ISO Xpert supports petroleum terminal operators, oil companies, and EPC contractors in achieving and maintaining API 2610 compliance โ from initial gap analysis and operations management system documentation through fire protection system review, overfill prevention programme assessment, loading/unloading procedure development, environmental compliance review, and BSEE/EPA/DOT regulatory audit preparation.
API 2610API 650API 653API Q1ISO 9001ISO 14001Fire Protection ReviewOverfill PreventionLoading Rack SafetyMarine Terminal SafetySPCC Plan ReviewTerminal SecurityEmergency Response PlanningTraining Courses
๐ Contact
๐ข
ISO Xpert Ltd 71-75 Shelton Street, Covent Garden London WC2H 9JQ, UK
Assessment data is stored locally in your browser. Contact info@iso-xpert.com for UK GDPR requests.
Contact
ISO Xpert Ltd | 71-75 Shelton Street, London WC2H 9JQ | info@iso-xpert.com
Terms of Use
Last Updated: April 2025 | ISO Xpert Ltd
For legitimate internal terminal operations compliance assessment. Results are indicative only. API 2610 is the property of the American Petroleum Institute (API). ISO Xpert Ltd is not affiliated with API. Governed by the laws of England and Wales.
Contact
ISO Xpert Ltd | 71-75 Shelton Street, London WC2H 9JQ | info@iso-xpert.com
Common Questions
API 2610 Terminal Tank Facilities Operations โ Frequently Asked Questions
Authoritative answers about API 2610 Terminal Tank Facilities Operations, inspection intervals, qualifications, RBI, and ISO Xpert consulting.
What is API 2610?
API 2610 is the American Petroleum Institute Standard for the Design, Construction, Operation, Inspection, and Maintenance of Terminal and Tank Facilities. It provides comprehensive requirements for the safe and environmentally responsible operation of petroleum product distribution terminals, pipeline terminal facilities, and bulk liquid storage facilities.
What types of terminal facilities does API 2610 cover?
API 2610 covers petroleum product terminals including: truck loading and unloading facilities, marine (ship and barge) loading terminals, railroad tank car loading and unloading facilities, pipeline terminal facilities, bulk product storage tank farms, blending and additive injection facilities, and custody transfer metering systems. It covers all liquid petroleum products from crude oil to refined petroleum products.
What are the overfill prevention requirements in API 2610?
API 2610 requires overfill prevention systems for all bulk liquid storage tanks receiving product by pipeline, marine, truck, or rail transfer. Requirements include: independent high-level alarm (audible and visual), automatic overfill protection shutdown (independent of normal level control), regular testing of all overfill prevention devices, documented testing records, and operational procedures for responding to high-level alarms. The overfill prevention system must be independent of the normal level indication system.
What fire protection is required for petroleum terminals per API 2610?
API 2610 requires fire protection systems for petroleum terminals including: adequate water supply and foam systems for tank fires, fixed foam systems on floating roof tank rim seal areas, cooling water systems for exposed equipment, dry chemical or CO2 systems for loading rack areas, emergency shutdown systems, fire and gas detection, and trained fire response personnel or access to emergency services. Fire protection design shall be per NFPA 11 (foam), NFPA 30 (flammable liquids), and applicable local codes.
Can ISO Xpert help with API 2610 terminal compliance?
Yes. ISO Xpert provides API 2610 terminal and tank facility gap analysis, operations management system development, fire protection review, overfill prevention programme assessment, environmental management review, security assessment, and training for terminal operations personnel. Contact us at info@iso-xpert.com or call +44 7853 109840.